Start with a sketch or architect drawing. Then we can lay in equipment to manufacture specs. Then create a 3d drawing to see equipment spacing and make changes.
Hand Sketch > CAD > 3D drawing
2
Install equipment
When the building is ready equipment install can began. ProMain is a license General Contractor so we are very familiar with construction and needs for installation. We will work closely with you or your GC to ensure all project deadlines are meet.
Equipment in process of being installed.
3
Equipment has been installed! Setup training and start using!